Sunday, March 18, 2007

Master Bathroom project COMPLETED

Finally, the master bathroom "remodel" is complete. After taking a couple of weekends off and finally finding a vanity, we have completed the project. The floor has been grouted for several weeks now. Last weekend we found out the vanity we wanted was not made in the finish we like best. The finish we liked second best was available for the vanity we wanted. We bought the matching mirror and storage cabinet last Saturday. I returned the other mirror and storage cabinet and bought the new vanity last Sunday. I replaced the old light switches and outlet. We installed the vanity and dry fit the counter top. Monday we attached the counter top, back splash, and side splash. Tuesday Kelly cut the base moulding. I hooked up the water to the faucet and drain to the sink. Kelly started staining the base moulding during the day on Wednesday and I applied the flexible grout next to the tub and transition at the door. Kelly finished staining the moulding on Thursday. We applied polyurethane to the moulding yesterday and I hung up the mirror. Today we finished everything off. We installed the moulding, adjusted the light fixture to be centered over mirror, reinstalled the toilet, hung up the storage cabinet, put the blinds back on the window, and hung the door back up. Now we can look at the bathroom and feel great about how it turned out. See for yourself below.

After Grouting
Before

After

Before

After